Mineral Processing Circuit Upgrade | OPS Consulting Case Study
Machines: Terex Finlay 693+ (20×5) Supertrak, C-1545 Cone Crusher and the 984 (20×6) Horizontal Screener
Location: Port Hedland WA
Material: Basalt Stockpile
The Problem:
The Solution:
Outcomes:
The ability to generate five products from the newly optimised mineral processing circuit opened up new avenues for the customer. The 984, in position as the final screen, is able to ensure smaller aggregates are in spec and are dust free. All three Terex Finlay units feature Australian spec options (hot climate packs) and offer excellent fuel efficiency. The 984 and C-1545 are also fitted with Finlay’s T-Link System which allows for offsite real-time monitoring.
Optimisation of the processing circuit allowed our client to fulfil the production needs of his business. OPS aims to provide expert and industry-leading advice to all of our customers.


Other Case Studies
Terex Finlay C1550 Cone Crusher | To Repair or Replace?
A Terex Finlay C1550 Cone Crusher came in with a failure which might have resulted in scrapping the unit. However, OPS rebuilt the chamber for approximately 19% of the cost of replacement.
A Mobile Plant Solution | Improving Goldmine Productivity
A mobile plant for a gold mining operation resulted in a faster, more efficient and productive business.
Mineral Processing Circuit Upgrade | OPS Consulting Case Study
A client's mineral processing circuit needed an upgrade in order to re-crush and screen existing stockpiles of already crushed Basalt. Their current equipment was not able to screen out all the required sizes.
Telestack Conveyor TC424X | Increasing Production Efficiency By 78%
The client was looking to increase production volumes and stockpile capacity but was limited by the existing stacker to around 250-275TPH.